Home/Process

About 21 days from first visit to first unit.

One engineer owns your project from the survey to commissioning, and you can reach them on WhatsApp the whole way.

  1. 01 · Day 1

    Free site survey

    An engineer visits, checks shading through the day with a sun-path tool, measures the roof and reads your last 12 bills.

    Free site survey
  2. 02 · Day 2–3

    Design + quote

    You get a roof layout, generation estimate and one fixed price. No surprise extras on the day.

    Design + quote
  3. 03 · Day 3–10

    Paperwork

    We file the subsidy application and DISCOM net-meter request in your name.

    Paperwork
  4. 04 · Day 11–14

    Installation

    Structure, panels, inverter, earthing and lightning arrestor. Most homes are done in one day.

    Installation
  5. 05 · Day 15–21

    Net meter + switch-on

    DISCOM inspection, net meter fitted, system commissioned. You get app access the same day.

    Net meter + switch-on
  6. 06 · Ongoing

    Five years of care

    Free maintenance visits, remote monitoring, and a call from us if generation drops.

    Five years of care

Warranties

In writing, in your name.

Manufacturer warranties are registered to you, not to us, so they hold even if you sell the house.

25 yrspanel performance (≥ 80% output)
12 yrspanel product warranty
8–10 yrsinverter, by manufacturer
5 yrsworkmanship + free maintenance